- 02/05/2019
- 1 Min Read
- By: Evan Madore
Mezzanine Progress - Experience Center Expansion Episode 5
Have you heard? We're expanding our facility to include a brand-new, 18,000 square-foot Customer Experience Center equipped with a full motorsports facility, content studio, 24-hour parts pickup and more. Last week we were below the mezzanine, this week Alex takes us to what's on top.
In episode five of our expansion updates, we tour the new community center atop the mezzanine. If you were to sit in on our recent company meetings, you'd see us basically sitting on top of one another. With our rapid growth, our team has outgrown every meeting space we have available. While it doesn't look like much yet, the new modular design of the mezzanine will give us the flexibility to adapt to whatever event we have in the space.
If you reference the render, squint really hard, and use your imagination, you can almost see the new community center on the mezzanine. The focal point and one of our favorite design features of this new space is the massive cantilevered glass wall looking down upon the motorsports space. Just imagine having a birds-eye view of the FCP Euro motorsports fleet during a company or vendor meeting, or even while hanging out during one of our Cars and Coffee.
Another feature that's going to be extremely handy to have up here is the new kitchen. Lunch meetings, celebrations, community gatherings—having the space to support the culinary needs of our aggressive event calendar is more of a need than a want at this point in time.
The expansion continues to progress faster than anticipated. We'll be in the new space in no time, and you should be able to check it out during this years' first Cars and Coffee. If you're curious about the progression, you can head to episode 4 to see how far we've already come. Check out the video below for part five of Alex's walkthrough and make sure to subscribe for upcoming updates.